← Back to TODO 02 PRE BEACON

THE PLAN

Documentation for THE_PLAN from the Ds ex repository.

Looking at the BEACON tests you have waiting and comparing them to my comprehensive test plan, our approach is solid and complementary. Here’s the analysis:

Plan Confirmation: Excellent Alignment

Your BEACON tests are perfectly positioned for post-gap-filling integration, while my test plan focuses on the critical infrastructure gaps that need to be filled first. There’s minimal redundancy and strong synergy.

🔄 Minor Adjustments Needed

1. Merge Utility Function Tests

Your BEACON Utils vs My Program Utilities

  • Your: text_similarity, answer_normalization, keyword_extraction (BEACON-specific)
  • Mine: program_name/1, implements_program?/1 (DSPEx core infrastructure)

Action: Keep both - they serve different layers of the stack.

2. Consolidate Telemetry Tests

Your: BEACON telemetry and observability
Mine: General telemetry & observability tests

Action: Your BEACON telemetry tests can extend my foundational telemetry tests rather than replace them.

3. Performance Test Coordination

Your: BEACON benchmark and performance tests
Mine: Pre-BEACON performance validation

Action: My tests establish baseline performance, your tests validate BEACON-specific optimization performance.

Phase 1: My Infrastructure Tests (Week 1-2)

Execute my comprehensive test plan to fill critical gaps:

  • DSPEx.Teleprompter behavior tests
  • DSPEx.OptimizedProgram interface tests
  • DSPEx.Program utility tests
  • Basic client reliability tests

Phase 2: Integration Bridge (Week 3)

  • Pre-BEACON validation tests (my list)
  • BEACON compatibility interface tests (subset of mine)

Phase 3: BEACON Implementation (Week 4+)

Execute your complete BEACON test suite:

  • beacon_test.exs - Full BEACON teleprompter
  • utils_test.exs - BEACON-specific utilities
  • integration_test.exs - Production optimization workflows
  • examples_test.exs - Real-world usage patterns
  • continuous_optimizer_test.exs - Long-running optimization
  • benchmark_test.exs - Performance validation

🎯 Strategic Value

Your BEACON tests provide exactly what’s missing from my plan:

  • Real-world examples showing actual usage patterns
  • Continuous optimization for production scenarios
  • Advanced benchmarking for performance validation
  • Production integration workflows

My tests provide the foundation your BEACON tests need:

  • Core interfaces that BEACON depends on
  • Basic behaviors that must exist before BEACON can compile
  • Infrastructure reliability that BEACON assumes

Final Recommendation

Keep your BEACON test suite exactly as planned. My infrastructure tests create the foundation, your BEACON tests validate the complete vision. The sequencing is perfect:

  1. My tests: Fill infrastructure gaps → BEACON can compile
  2. Your tests: Validate BEACON functionality → Production ready

Zero redundancy, maximum value. Our plan is solid. 🚀