V2 Pool Implementation Prompts - Migration and Deployment

Pre-Migration Preparation

Prompt M.1.1 - Feature Flag Setup

We're preparing for V2 Pool migration and deployment.
Current status: All development phases complete
Today's goal: Set up feature flag system

Create lib/dspex/feature_flags.ex from Design Doc 7. Implement:
1. GenServer for flag management
2. Default flags configuration
3. Gradual rollout percentage logic
4. Flag persistence mechanism

Test the feature flag system works correctly.

Prompt M.1.2 - Compatibility Layer

Create lib/dspex/python_bridge/compatibility_adapter.ex from Design Doc 7:
1. Routes between V1 and V2 based on flags
2. Maintains API compatibility
3. Adds telemetry for routing decisions
4. Supports gradual rollout

Test both V1 and V2 paths work through the adapter.

Prompt M.1.3 - Database Migrations

Create the migration file for V2 pool tables:
1. Pool configurations table
2. Pool metrics history table
3. Migration status tracking
4. Indexes for performance

Run the migration and verify tables are created.

Migration Implementation

Prompt M.2.1 - Migration Script

Create lib/dspex/migration/pool_migration.ex from Design Doc 7:
1. Environment validation
2. State backup functionality
3. V2 component deployment
4. Health verification
5. Gradual rollout enablement

Test the migration script in development.

Prompt M.2.2 - Migration Monitor

Create lib/dspex/migration/migration_monitor.ex to track health during migration:
1. Health check scheduling
2. Metric comparison (V1 vs V2)
3. Alert threshold checking
4. Automatic rollback triggers

Test monitoring detects issues correctly.

Prompt M.2.3 - Rollback Manager

Create lib/dspex/migration/rollback_manager.ex:
1. Rollback condition detection
2. Graceful rollback execution
3. Connection draining
4. Component cleanup
5. Notification system

Test rollback works cleanly.

Gradual Rollout

Prompt M.3.1 - Traffic Controller

Create lib/dspex/migration/traffic_controller.ex for staged rollout:
1. Rollout stage management
2. Automatic stage advancement
3. Health-based progression
4. Stage timing control

Test traffic routing at different percentages.

Prompt M.3.2 - Rollout Validation

Create validation tests for each rollout stage:
1. 5% traffic validation
2. 25% traffic validation
3. 50% traffic validation
4. 100% traffic validation

Ensure metrics remain healthy at each stage.

Production Validation

Prompt M.4.1 - Validation Suite

Create lib/dspex/migration/validation_suite.ex:
1. Functional equivalence tests
2. Performance comparison tests
3. Error handling verification
4. Load test execution

Run full validation suite.

Prompt M.4.2 - Production Checklist

Create and execute production validation checklist:
1. Verify all tests pass
2. Check performance meets SLAs
3. Confirm monitoring works
4. Validate rollback procedures
5. Review documentation

Document any issues found.

Deployment Execution

Prompt M.5.1 - Pre-deployment

Execute pre-deployment steps:
1. Run final test suite
2. Create deployment package
3. Backup current state
4. Notify stakeholders
5. Prepare rollback plan

Confirm ready for deployment.

Prompt M.5.2 - Deploy Phase 1

Deploy with 5% traffic:
1. Enable feature flags
2. Start V2 components
3. Route 5% traffic to V2
4. Monitor metrics closely
5. Validate health

Document initial results.

Prompt M.5.3 - Monitor and Advance

Monitor and advance through stages:
1. Check error rates
2. Compare latencies
3. Verify throughput
4. Monitor resource usage
5. Advance to next stage when stable

Continue until 100% traffic.

Post-Deployment

Prompt M.6.1 - V1 Decommission

Create lib/dspex/migration/decommission.ex:
1. Verify V2 fully operational
2. Archive V1 data
3. Remove V1 code
4. Clean up resources

Execute decommissioning safely.

Prompt M.6.2 - Final Report

Create comprehensive migration report:
1. Migration timeline
2. Issues encountered
3. Performance improvements
4. Lessons learned
5. Future recommendations

Document complete migration journey.

Emergency Procedures

Prompt M.7.1 - Emergency Rollback

Test emergency rollback procedure:
1. Simulate critical failure
2. Execute emergency rollback
3. Verify V1 takes all traffic
4. Check data consistency
5. Document recovery time

Ensure rollback is reliable.

Prompt M.7.2 - Incident Response

Create incident response procedures:
1. Alert escalation paths
2. Diagnostic commands
3. Mitigation steps
4. Communication templates
5. Post-mortem process

Test with simulated incidents.

Operational Handoff

Prompt M.8.1 - Operations Guide

Create comprehensive operations guide:
1. System architecture overview
2. Monitoring and alerts
3. Common procedures
4. Troubleshooting guide
5. Performance tuning

Review with operations team.

Prompt M.8.2 - Training Materials

Create training materials:
1. V2 pool concepts
2. Operational procedures
3. Monitoring dashboards
4. Incident response
5. Hands-on exercises

Conduct training sessions.

Final Validation

Prompt M.9.1 - Success Criteria

Validate all success criteria met:
1. Zero customer impact ✓
2. Performance improved ✓
3. Error handling enhanced ✓
4. Monitoring comprehensive ✓
5. Team trained ✓

Create success report.

Prompt M.9.2 - Project Closure

Complete project closure:
1. Archive project artifacts
2. Document lessons learned
3. Update system documentation
4. Close tracking tickets
5. Celebrate success!

The V2 Pool implementation is complete.