DSPex Implementation Tasks
Overview
This document contains the complete breakdown of implementation tasks for DSPex V2, organized by component with dependencies, time estimates, and clear acceptance criteria.
Task Notation
- ID: Component.Number (e.g., CORE.1)
- Status: 🔴 Not Started | 🟡 In Progress | 🟢 Complete
- Priority: P0 (Critical) | P1 (High) | P2 (Medium) | P3 (Low)
- Time: Estimated hours
- Dependencies: Task IDs that must complete first
Role Definitions
- Architect: System design, API design, integration patterns
- Core Dev: Core functionality implementation
- Bridge Dev: Python integration specialist
- Test Engineer: Testing infrastructure and test writing
- DevOps: Environment setup, CI/CD, deployment
1. Core Infrastructure Tasks
CORE.1: Project Setup and Configuration
- Status: 🔴
- Priority: P0
- Time: 2 hours
- Role: DevOps
- Dependencies: None
- Acceptance Criteria:
- Mix project structure validated
- All config files (dev.exs, test.exs, runtime.exs) properly configured
- Dependencies added to mix.exs
- Project compiles without warnings
- Dialyzer configuration complete
CORE.2: Development Environment Setup
- Status: 🔴
- Priority: P0
- Time: 3 hours
- Role: DevOps
- Dependencies: CORE.1
- Acceptance Criteria:
- Python 3.8+ environment created
- DSPy installed in Python environment
- Snakepit Python scripts directory created
- Environment variables documented
- Developer setup guide written
CORE.3: CI/CD Pipeline Setup
- Status: 🔴
- Priority: P1
- Time: 4 hours
- Role: DevOps
- Dependencies: CORE.1, CORE.2
- Acceptance Criteria:
- GitHub Actions workflow created
- Mix test stages configured (fast, protocol, integration)
- Code quality checks automated (format, credo, dialyzer)
- Test coverage reporting enabled
- Build artifacts configured
2. Native Implementation Tasks
NATIVE.1: Signature Parser Implementation
- Status: 🔴
- Priority: P0
- Time: 8 hours
- Role: Core Dev
- Dependencies: CORE.1
- Acceptance Criteria:
- Parse basic signatures (input -> output)
- Parse typed signatures with type annotations
- Parse list types (list[str], List[int])
- Parse optional fields
- Parse descriptions
- Comprehensive error messages
- 100% test coverage
NATIVE.2: Template Engine Integration
- Status: 🔴
- Priority: P0
- Time: 6 hours
- Role: Core Dev
- Dependencies: CORE.1
- Acceptance Criteria:
- EEx templates compile correctly
- Variable binding works
- Nested data access supported
- Error handling for missing variables
- Template caching implemented
- Performance benchmarks pass
NATIVE.3: Validator Framework
- Status: 🔴
- Priority: P1
- Time: 6 hours
- Role: Core Dev
- Dependencies: NATIVE.1
- Acceptance Criteria:
- Type validation (string, number, list, etc.)
- Range validation
- Pattern matching validation
- Custom validator support
- Composable validators
- Clear validation error messages
NATIVE.4: Metrics Collection System
- Status: 🔴
- Priority: P2
- Time: 4 hours
- Role: Core Dev
- Dependencies: CORE.1
- Acceptance Criteria:
- Latency tracking per operation
- Success/failure rates
- Router decision tracking
- Memory usage tracking
- Metrics aggregation
- Export to monitoring systems
3. LLM Adapter Tasks
LLM.1: Adapter Protocol Definition
- Status: 🔴
- Priority: P0
- Time: 3 hours
- Role: Architect
- Dependencies: CORE.1
- Acceptance Criteria:
- Behaviour/Protocol defined
- Common interface for all adapters
- Streaming support interface
- Error handling patterns
- Configuration interface
- Documentation complete
LLM.2: InstructorLite Adapter
- Status: 🔴
- Priority: P0
- Time: 8 hours
- Role: Core Dev
- Dependencies: LLM.1
- Acceptance Criteria:
- InstructorLite dependency added
- Adapter implements protocol
- Structured output parsing works
- Retry logic implemented
- Error handling complete
- Integration tests pass
LLM.3: HTTP Adapter
- Status: 🔴
- Priority: P0
- Time: 6 hours
- Role: Core Dev
- Dependencies: LLM.1
- Acceptance Criteria:
- Generic HTTP client for LLM APIs
- Support OpenAI format
- Support Anthropic format
- Request/response logging
- Rate limiting support
- Connection pooling
LLM.4: Python DSPy Adapter
- Status: 🔴
- Priority: P1
- Time: 8 hours
- Role: Bridge Dev
- Dependencies: LLM.1, PYTHON.1
- Acceptance Criteria:
- Bridge to Python DSPy LM classes
- Configuration passthrough
- Model switching support
- Caching integration
- Performance acceptable (<100ms overhead)
LLM.5: Mock Adapter for Testing
- Status: 🔴
- Priority: P1
- Time: 3 hours
- Role: Test Engineer
- Dependencies: LLM.1
- Acceptance Criteria:
- Deterministic responses
- Configurable delays
- Error simulation
- Response recording
- Replay capability
4. Python Bridge Tasks
PYTHON.1: Snakepit Integration Layer
- Status: 🔴
- Priority: P0
- Time: 6 hours
- Role: Bridge Dev
- Dependencies: CORE.2
- Acceptance Criteria:
- Pool configuration working
- Process lifecycle management
- Error recovery implemented
- Performance monitoring
- Resource limits enforced
- Graceful shutdown
PYTHON.2: DSPy Module Registry
- Status: 🔴
- Priority: P0
- Time: 4 hours
- Role: Bridge Dev
- Dependencies: PYTHON.1
- Acceptance Criteria:
- Dynamic module discovery
- Module capability detection
- Version compatibility checks
- Module initialization
- Hot reload support
PYTHON.3: Serialization Protocol
- Status: 🔴
- Priority: P0
- Time: 6 hours
- Role: Bridge Dev
- Dependencies: PYTHON.1
- Acceptance Criteria:
- JSON serialization working
- MessagePack support
- Large data handling
- Type preservation
- Error serialization
- Performance benchmarks
PYTHON.4: Python Script Templates
- Status: 🔴
- Priority: P0
- Time: 8 hours
- Role: Bridge Dev
- Dependencies: PYTHON.1, PYTHON.2
- Acceptance Criteria:
- Base script template
- Module loader script
- Error handling wrapper
- Logging integration
- Performance profiling hooks
- All DSPy modules accessible
5. Router Implementation Tasks
ROUTER.1: Core Router Logic
- Status: 🔴
- Priority: P0
- Time: 8 hours
- Role: Architect
- Dependencies: NATIVE.1, PYTHON.2
- Acceptance Criteria:
- Route registration system
- Capability matching
- Fallback logic
- Performance tracking
- Route caching
- Thread-safe operations
ROUTER.2: Performance Optimizer
- Status: 🔴
- Priority: P2
- Time: 6 hours
- Role: Core Dev
- Dependencies: ROUTER.1, NATIVE.4
- Acceptance Criteria:
- Historical performance tracking
- Adaptive routing based on metrics
- A/B testing support
- Manual override capability
- Performance reports
ROUTER.3: Configuration System
- Status: 🔴
- Priority: P1
- Time: 4 hours
- Role: Core Dev
- Dependencies: ROUTER.1
- Acceptance Criteria:
- Runtime configuration changes
- Environment-based config
- Validation of configurations
- Default configurations
- Config hot reload
6. Pipeline Orchestration Tasks
PIPELINE.1: Basic Pipeline Engine
- Status: 🔴
- Priority: P0
- Time: 10 hours
- Role: Architect
- Dependencies: ROUTER.1
- Acceptance Criteria:
- Sequential execution
- Error propagation
- State management
- Result aggregation
- Cancellation support
- Progress tracking
PIPELINE.2: Parallel Execution
- Status: 🔴
- Priority: P1
- Time: 8 hours
- Role: Core Dev
- Dependencies: PIPELINE.1
- Acceptance Criteria:
- Task-based parallelism
- Resource pooling
- Synchronization primitives
- Deadlock prevention
- Performance scaling
- Error isolation
PIPELINE.3: Conditional Logic
- Status: 🔴
- Priority: P1
- Time: 6 hours
- Role: Core Dev
- Dependencies: PIPELINE.1
- Acceptance Criteria:
- If/then/else branches
- Switch statements
- Loop constructs
- Early exit conditions
- State-based conditions
- Dynamic routing
PIPELINE.4: Pipeline Persistence
- Status: 🔴
- Priority: P2
- Time: 8 hours
- Role: Core Dev
- Dependencies: PIPELINE.1
- Acceptance Criteria:
- Save pipeline state
- Resume from checkpoint
- Versioning support
- Migration tools
- Audit logging
7. Testing Infrastructure Tasks
TEST.1: Test Framework Setup
- Status: 🔴
- Priority: P0
- Time: 4 hours
- Role: Test Engineer
- Dependencies: CORE.1
- Acceptance Criteria:
- ExUnit configuration
- Test helpers created
- Fixture management
- Mock framework setup
- Property testing setup
- Coverage tools configured
TEST.2: Layer 1 Mock Tests
- Status: 🔴
- Priority: P0
- Time: 12 hours
- Role: Test Engineer
- Dependencies: TEST.1, All NATIVE.* tasks
- Acceptance Criteria:
- Mock adapter tests
- Unit test coverage >90%
- Fast execution (<70ms average)
- Deterministic results
- Clear test names
- Good error messages
TEST.3: Layer 2 Protocol Tests
- Status: 🔴
- Priority: P1
- Time: 10 hours
- Role: Test Engineer
- Dependencies: TEST.1, PYTHON.3
- Acceptance Criteria:
- Serialization round-trip tests
- Protocol compliance tests
- Error handling tests
- Performance benchmarks
- Edge case coverage
TEST.4: Layer 3 Integration Tests
- Status: 🔴
- Priority: P1
- Time: 16 hours
- Role: Test Engineer
- Dependencies: TEST.1, All components
- Acceptance Criteria:
- End-to-end scenarios
- Real Python integration
- Performance validation
- Resource leak detection
- Stress testing
- Failure recovery testing
TEST.5: Performance Benchmarks
- Status: 🔴
- Priority: P2
- Time: 6 hours
- Role: Test Engineer
- Dependencies: TEST.4
- Acceptance Criteria:
- Baseline measurements
- Regression detection
- Memory profiling
- Latency histograms
- Throughput testing
- Comparison with Python DSPy
8. Documentation Tasks
DOC.1: API Documentation
- Status: 🔴
- Priority: P1
- Time: 8 hours
- Role: Core Dev
- Dependencies: All implementation tasks
- Acceptance Criteria:
- ExDoc configuration
- Module documentation
- Function documentation
- Type specifications
- Usage examples
- Generated docs site
DOC.2: Integration Guide
- Status: 🔴
- Priority: P1
- Time: 6 hours
- Role: Architect
- Dependencies: PIPELINE.1, LLM.2
- Acceptance Criteria:
- Getting started guide
- Configuration guide
- LLM adapter guide
- Python integration guide
- Troubleshooting guide
- Migration guide
DOC.3: Example Applications
- Status: 🔴
- Priority: P2
- Time: 10 hours
- Role: Core Dev
- Dependencies: All implementation tasks
- Acceptance Criteria:
- Simple RAG example
- Multi-step reasoning example
- Parallel search example
- Custom validator example
- Performance optimization example
- All examples have tests
Critical Path
The critical path for MVP delivery:
Week 1: Foundation
- CORE.1 → CORE.2 → PYTHON.1 → PYTHON.2
- NATIVE.1 (parallel)
- LLM.1 → LLM.2 (parallel)
Week 2: Core Features
- ROUTER.1
- PIPELINE.1
- PYTHON.3 → PYTHON.4
- TEST.1 → TEST.2 (ongoing)
Week 3: Integration
- Complete all P0 tasks
- TEST.3 → TEST.4
- Fix integration issues
Week 4: Polish
- P1 tasks
- DOC.1 → DOC.2
- Performance optimization
- Final testing
Daily Milestones
Days 1-5: Foundation Sprint
- Day 1: CORE.1, CORE.2 complete
- Day 2: NATIVE.1 complete, PYTHON.1 started
- Day 3: LLM.1, LLM.2 started
- Day 4: PYTHON.1, PYTHON.2 complete
- Day 5: TEST.1 complete, first tests running
Days 6-10: Core Implementation
- Day 6: ROUTER.1 started
- Day 7: PIPELINE.1 started
- Day 8: NATIVE.2, NATIVE.3 complete
- Day 9: LLM.2 complete, integration tested
- Day 10: PYTHON.3, PYTHON.4 complete
Days 11-15: Integration Sprint
- Day 11: ROUTER.1 complete
- Day 12: PIPELINE.1 complete
- Day 13: First end-to-end test passing
- Day 14: TEST.3 complete
- Day 15: All P0 tasks complete
Days 16-20: Enhancement Sprint
- Day 16: PIPELINE.2 (parallel execution)
- Day 17: PIPELINE.3 (conditionals)
- Day 18: LLM.3 (HTTP adapter)
- Day 19: ROUTER.2 (optimizer)
- Day 20: TEST.4 complete
Days 21-25: Quality Sprint
- Day 21: Performance benchmarks
- Day 22: DOC.1 (API docs)
- Day 23: DOC.2 (guides)
- Day 24: DOC.3 (examples)
- Day 25: Bug fixes, optimization
Days 26-30: Release Sprint
- Day 26: Final integration testing
- Day 27: Performance validation
- Day 28: Documentation review
- Day 29: Release preparation
- Day 30: Launch readiness
Weekly Goals
Week 1: Foundation (40 hours)
- Project setup complete
- Core native modules working
- Python bridge operational
- Basic testing infrastructure
Week 2: Integration (45 hours)
- Router making decisions
- Pipeline executing tasks
- Native/Python interop working
- Integration tests passing
Week 3: Features (40 hours)
- All P0 features complete
- Advanced pipeline features
- Multiple LLM adapters
- Performance acceptable
Week 4: Polish (35 hours)
- Documentation complete
- Examples working
- Performance optimized
- Production ready
Risk Mitigation
High-Risk Tasks
PYTHON.1 (Snakepit Integration): Critical dependency
- Mitigation: Early spike, have fallback plan
ROUTER.1 (Core Router): Complex logic
- Mitigation: Extensive testing, simple first version
PIPELINE.1 (Pipeline Engine): Core functionality
- Mitigation: Start simple, iterate
Dependencies to Watch
- Python environment setup
- DSPy version compatibility
- InstructorLite integration
- Performance requirements
Success Metrics
Sprint Velocity
- Target: 8 hours/day productive coding
- Measure: Tasks completed vs estimated
Quality Metrics
- Test coverage: >90% for core modules
- Dialyzer: Zero warnings
- Credo: Zero issues
- Documentation: 100% public API documented
Performance Targets
- Native operations: <10ms
- Python bridge overhead: <50ms
- Pipeline overhead: <5ms per step
- Memory usage: <100MB base
Notes
- All time estimates include testing and documentation
- P0 tasks block release
- P1 tasks should be complete for good UX
- P2 tasks can be deferred to v2.1
- Daily standups recommended even for solo dev
- Use task IDs in commit messages for tracking