← Back to Foundation

PHASE CHECKLIST

Documentation for PHASE_CHECKLIST from the Foundation repository.

FOUNDATION JIDOSYSTEM RECOVERY CHECKLIST

PHASE 1: IMMEDIATE STABILIZATION ⏳ IN PROGRESS

TARGET: <5 test failures, no warnings CURRENT: 14 failures, ~15 warnings

Registry Configuration ✅ DONE

  • Start MABEAM.AgentRegistry in test_helper
  • Fix registry PID configuration
  • Registry errors resolved (27→14 failures)

Fix Remaining Test Failures

  • Add Foundation.Registry.count/1 function
  • Implement count/1 in MABEAM.AgentRegistry
  • Fix action parameter validation issues
  • Fix process cleanup between tests
  • Fix agent coordination test failures

Fix All Warnings

  • Fix charlist deprecation (use ~c sigil)
  • Fix Logger.warn → Logger.warning deprecation
  • Fix unused variable warnings (prefix with _)
  • Fix unused alias warnings
  • Fix :scheduler.utilization/1 undefined
  • Fix unreachable clause warnings

Quality Gates

  • ✅ ALL TESTS PASSING (281/281)
  • ✅ NO WARNINGS (0 compilation warnings)
  • ✅ NO DIALYZER ERRORS
  • ✅ NO CREDO WARNINGS
  • ✅ COMMIT PHASE 1

PHASE 2: COMPLETE CORE IMPLEMENTATION 🔄 PENDING

TARGET: Production-ready Foundation services

Foundation Infrastructure Completion

  • Registry Implementation
    • Add comprehensive registry tests
    • Fix ETS/Agent backend selection
    • Add registry performance monitoring
  • Circuit Breaker Integration
    • Complete timeout configuration
    • Add failure threshold config
    • Integrate with JidoSystem actions
  • Telemetry Pipeline
    • Enhance metrics collection
    • Add comprehensive events
    • Integrate with MABEAM

JidoSystem Action Robustness

  • Process Task Enhancement
    • Fix parameter validation
    • Add comprehensive retry logic
    • Implement circuit breaker integration
  • Agent Lifecycle Management
    • Strengthen supervision
    • Add graceful shutdown
    • Implement health monitoring
  • Signal Routing Completion
    • CloudEvents compliance
    • Event ordering guarantees
    • Error handling fixes

Quality Gates

  • ✅ ALL TESTS PASSING (281/281)
  • ✅ NO WARNINGS
  • ✅ NO DIALYZER ERRORS
  • ✅ NO CREDO WARNINGS
  • ✅ COMMIT PHASE 2

PHASE 3: MABEAM COORDINATION ENHANCEMENT 🔄 PENDING

TARGET: Reliable multi-agent orchestration

Multi-Agent Coordination

  • Agent Registry Scaling
    • Distributed agent discovery
    • Agent capability matching
    • Registry sharding
  • Coordination Patterns
    • Workflow orchestration
    • Agent dependency resolution
    • State management
  • Team Orchestration
    • Dynamic team formation
    • Load balancing algorithms
    • Performance monitoring

Performance & Monitoring

  • Performance Monitoring
    • Metrics collection
    • Alerting thresholds
    • Performance analytics
  • Health Sensors
    • Predictive monitoring
    • Resource usage tracking
    • System health analysis
  • Operational Excellence
    • Runbook automation
    • Deployment pipeline
    • Monitoring dashboards

Quality Gates

  • ✅ ALL TESTS PASSING (281/281)
  • ✅ NO WARNINGS
  • ✅ NO DIALYZER ERRORS
  • ✅ NO CREDO WARNINGS
  • ✅ COMMIT PHASE 3

PHASE 4: DISTRIBUTION READINESS 🔄 PENDING

TARGET: Distribution-ready architecture

Location Transparency

  • Agent Reference System
    • Logical agent references
    • Node-aware routing
    • Location abstractions
  • Message Envelope Pattern
    • Message versioning
    • Routing information
    • Delivery guarantees

Failure Mode Enhancement

  • Network-Aware Failure Detection
    • Timeout-based health checks
    • Partition tolerance
    • Split-brain prevention
  • State Consistency Preparation
    • State ownership model
    • Idempotent operations
    • Eventual consistency

Configuration Evolution

  • Distributed Config Support
    • Config schema evolution
    • Environment-specific configs
    • Runtime config updates

Quality Gates

  • ✅ ALL TESTS PASSING (281/281)
  • ✅ NO WARNINGS
  • ✅ NO DIALYZER ERRORS
  • ✅ NO CREDO WARNINGS
  • ✅ COMMIT PHASE 4

PHASE 5: PRODUCTION HARDENING 🔄 PENDING

TARGET: Production-grade security & compliance

Security & Compliance

  • Security Hardening
    • Security monitoring
    • Audit logging
    • Access control
    • Data encryption
  • Compliance Automation
    • Automated compliance checking
    • Backup procedures
    • Incident response
    • Data retention policies

Capacity & Performance

  • Resource Management
    • Capacity planning algorithms
    • Auto-scaling support
    • Cost optimization
  • Load Testing
    • Chaos testing
    • Performance regression testing
    • Stress testing
    • Distributed system testing

Monitoring Enhancement

  • Comprehensive Dashboards
  • Alerting Rules
  • Performance Baselines
  • SLA Monitoring

Quality Gates

  • ✅ ALL TESTS PASSING (281/281)
  • ✅ NO WARNINGS
  • ✅ NO DIALYZER ERRORS
  • ✅ NO CREDO WARNINGS
  • ✅ COMMIT PHASE 5

PHASE 6: FINAL CLEANUP & OPTIMIZATION 🔄 PENDING

TARGET: Optimized production-ready system

Code Quality Final Pass

  • Type Specifications
    • Complete all @spec annotations
    • Fix type inconsistencies
    • Add missing types
  • Performance Optimization
    • Profile hot paths
    • Optimize memory usage
    • Add strategic caching
  • Code Cleanup
    • Remove unused code
    • Optimize imports
    • Clean up comments

Testing Enhancement

  • Integration Testing
    • End-to-end tests
    • Contract tests
    • Property-based tests
  • Test Coverage
    • 100% line coverage
    • Edge case coverage
    • Error path coverage

Documentation

  • API Documentation
  • Deployment Guides
  • Troubleshooting Guides
  • Migration Guides

Final Validation

  • ✅ ALL TESTS PASSING (281/281)
  • ✅ NO WARNINGS
  • ✅ NO DIALYZER ERRORS
  • ✅ NO CREDO WARNINGS
  • ✅ Performance benchmarks met
  • ✅ Security scan clean
  • ✅ FINAL COMMIT

PROGRESS TRACKING

  • PHASE 1: ⏳ IN PROGRESS (14 failures remaining)
  • PHASE 2: 🔄 PENDING
  • PHASE 3: 🔄 PENDING
  • PHASE 4: 🔄 PENDING
  • PHASE 5: 🔄 PENDING
  • PHASE 6: 🔄 PENDING

OVERALL: 0/6 phases complete ESTIMATED TIME: Hours and hours of continuous work STOPPING CRITERIA: 100% completion only